Getting Ready for School to Start in Nicaragua!
School starts for the 2011 school year on Monday, Feb. 21st at Centro Escolar LifeLink and I’m really excited! Over the last week that we’ve been back in Nicaragua, I’ve enjoyed catching up with our students and their families as they stop by the base. Everyone is looking forward to
Building Walkways to the Future!
It’s time to build the sidewalk joining the new primary school building to the auditorium, kitchen and bathrooms! We will build the sidewalk up high enough that it won’t be affected by local flooding, which leaves us with a stemwall design. Basically, we build a box with blocks off the