We’ve been working hard to prepare everything necessary to start classes on Feb. 22, and one of the big things is our bathroom! The new bathroom building is located on the left side of the auditorium, has 4 small toilets for children, and 2 larger toilets for adults. The plumbing runs to our 7,122 gallon septic tank, large enough to hold a small car. The roof line is lifted a little higher than normal, and decorative blocks surround the top course to provide ventilation.
The next steps are to install the fixtures, lay the tile, paint, and install doors. This will be a great improvement for LifeLink Education Center!
-Wayne